What a loop budget is
A two-wire transmitter needs a minimum voltage across it to operate. Everything else in the loop consumes voltage: the sense resistor in the PLC input, the cable resistance, any indicator or isolator, and the barrier if the area is hazardous. If the supply cannot cover the total, the transmitter stops regulating and the reading collapses at the top of the range, which looks like a sensor fault.
Working the numbers
The calculation is simple and worth doing on paper before ordering:
- Available supply voltage, for example 24 V
- Minus the transmitter minimum, typically 10 to 12 V
- Minus the sense resistor drop, 250 Ω at 20 mA is 5 V
- Minus the cable drop, roughly 0.02 Ω per metre per core, doubled for the return path
- Minus any indicator or isolator burden, typically 2 to 3 V
If the result is negative, the loop will misbehave at high signal. The fix is a higher supply, a smaller sense resistor, or a transmitter with a lower minimum voltage. Note it now, not after commissioning.
Where earth loops come from
Two earth connections at different potentials, joined by a signal cable, form a loop. Current flows through the shield or the signal return, and the resulting offset appears as a measurement error that changes with plant load. Common sources are a sensor earthed through its housing at one end of a building and the panel earthed at the other, or a thermocouple welded to a grounded pipe with a grounded transmitter.
Galvanic isolation breaks the loop without changing the wiring topology. That is why an isolating conditioner is often the cheapest repair for a signal that has been unreliable for months.
Noise from drives
Variable frequency drives inject common-mode noise onto cables that run in the same duct. Symptoms are a reading that jumps when a motor starts, or a value that sits a few percent high all the time. Three measures, in order of effectiveness: separate the signal cable from the drive cable, shield the signal cable and bond the shield at one end, and add an isolating conditioner at the panel.
Digital alternatives
IO-Link avoids most of these problems because the transmission is digital and the sensor reports its own diagnostics. For new machines, a master with eight ports often costs less than the analogue input card plus the isolation it would need.
Checklist
- Calculate the loop budget with the sense resistor and cable included
- Isolate any signal that leaves the panel or crosses between buildings
- Bond shields at one end only, and keep them continuous through junctions
- Separate signal and drive cable by 200 mm in the duct
- Verify the loop at two points, not just at zero